{"id":21943,"date":"2024-01-02T11:53:01","date_gmt":"2024-01-02T06:53:01","guid":{"rendered":"https:\/\/dailyausaf.com\/en\/?p=21943"},"modified":"2024-01-02T11:53:01","modified_gmt":"2024-01-02T06:53:01","slug":"electricity-supply-from-the-guddu-power-plant-remains-suspended","status":"publish","type":"post","link":"https:\/\/dailyausaf.com\/en\/latest-news\/electricity-supply-from-the-guddu-power-plant-remains-suspended\/","title":{"rendered":"Electricity supply from the Guddu Power Plant remains suspended"},"content":{"rendered":"<p>KASHMORE \u2013 The power supply from the Guddu Thermal Power Plant was unable to be restored because authorities were unable to repair the technical fault despite a 48-hour period. A technical fault caused the power breaker at the switch yard to catch fire.<\/p>\n<p>Despite the passage of two days, the power breaker at Guddu Thermal Power Plant could not be repaired.<\/p>\n<p>Read More:\u00a0<em><strong><a href=\"https:\/\/dailyausaf.com\/en\/pakistan\/rates-for-electricity-will-increase-by-rs4-66-per-unit.html\">Rates for electricity will increase by Rs 4.66 per unit<\/a><\/strong><\/em><\/p>\n<p>The high transmission lines of 500 KV tripped as a result of the technical fault. Four power transmission lines were tripped, according to officials.<\/p>\n<p>Electricity has been cut off in several areas, including Shikarpur, Jacobabad, Muzaffargarh, Sibi, and Dera Ghazi Khan.<\/p>\n<p>Read More:\u00a0<strong><em><a href=\"https:\/\/dailyausaf.com\/en\/pakistan\/concerns-are-raised-by-a-potential-increase-in-electricity-rates-of-rs4-66-per-unit.html\">Concerns are raised by a potential increase in electricity rates of Rs4.66 per unit<\/a><\/em><\/strong><\/p>\n<p>Power has been out in several areas of Sindh, Punjab, and Balochistan for the past 5 hours. Authorities say the situation will last until the sun rises.<\/p>\n<p>According to Guddu Thermal House officials, the purchase of a new breaker could take up to 15 days. Because of a malfunction, that breaker caught fire.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>KASHMORE \u2013 The power supply from the Guddu Thermal Power Plant was unable to be restored because authorities were unable to repair the technical fault despite a 48-hour period. A technical fault caused the power breaker at the switch yard to catch fire. Despite the passage of two days, the power breaker at Guddu Thermal [&hellip;]<\/p>\n","protected":false},"author":9,"featured_media":21944,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[9,21,2],"tags":[10512,10511,2753,10289],"class_list":["post-21943","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-latest-news","category-news","category-pakistan","tag-electricity-supply","tag-guddu-power-plant","tag-nepra","tag-wapda"],"_links":{"self":[{"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/posts\/21943","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/users\/9"}],"replies":[{"embeddable":true,"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/comments?post=21943"}],"version-history":[{"count":0,"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/posts\/21943\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/media\/21944"}],"wp:attachment":[{"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/media?parent=21943"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/categories?post=21943"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/dailyausaf.com\/en\/wp-json\/wp\/v2\/tags?post=21943"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}